Roof, Siding, Window & Door Permits


A Building Permit is required for all work involving roofing, siding, windows and doors. Permits can be issued over the counter is the size of the opening is not changing. If the opening size is changing to be either smaller or larger than the original, we will need a plan showing the changes being made which will need to be reviewed by our inspector

Permit Valuations are based off of the MN Department of Labor and Industry 2015 Building Valuation Data & Cost Data found here...

Window Permits - Include the number of windows being installed and if the size of the opening is changing.

Roofing/Siding - Include what structure(s) are being reroofed or sided.

Related Documents